Mitsubishi Electric Air Conditioner Network SystemAI controllerPAC-YG63MCAInstallation/Instruction ManualBefore using the device, carefully read this
97-4. Connecting Alarm Setpoint OutputsThe maximum wire length is 100 m. However, since the use of long wires makes the device susceptible to noise, u
10After completing the procedures described in "6. Installation" and "7. Wiring Instructions", set the initial settings in accorda
11(3) Turn on the power of this device.Verify that the LED16 (CPU power on) and LED17 (M-NET power on) are lit. (4) Set the time.Set the current time
12Set the dip switches for function selection according to the system to be used.At factory default, the SW01, SW02, SW03, SW08, and SW09 dipswitches
13The LEDs of this device indicate the upper/lower limit alarm interlock output status and error status of this device.10-1.Alarm Setpoint Output and
14Use the following procedure to confirm operation of the system.(1) Configure the settings of this device and the system controller while referring t
WT04975X02Printed in JapanThis product is designed and intended for use in the residential,commercial and light-industrial environment.This product at
1• Thoroughly read the following safety precautions before use.• Hazards that can occur from incorrect handling are classified by the symbols below:•
2The AI controller measures temperature and humidity; it also has an alarm capability if the measurement data exceeds defined setpoints. Historical me
34-2. External Dimensions[ 24 VDC Power Supply]N623Al controllerPAC-YG63MCAMODELSERVICE REF. PAC-INPUTWEIGHTSERIAL No.MADE IN JAPANYG60MCA-J VOL
46-1. Parts Purchased SeparatelyPrepare the following parts to install this device.[Parts to be Purchased Separately][Commercially available parts]6 I
56-2. Installation InstructionsThe AI controller PAC-YG63MCA does not have a waterproof structure.Be sure to install the AI controller inside a contro
6(3) Refer to "7. Wiring Instructions" and connect the wires for the power line, M-NET transmission line, output signal lines, and sensor in
77-2. Connecting the Power and M-NET Transmission LinesS FG M-NETS / B / A (M1) (M2)UURV+/V-/FG CN02 A/B/S Tightening torque for terminal screws: 1
87-3. Connecting the Sensors•For channel 1, select one of the following four types: Pt100 detection, 4 to 20 mADC, 1 to 5 VDC, or 0 to 10 VDC analog i